THU THIEM ZEIT RIVER
Thu Thiem Zeit River is a high-class apartment project in District 2 in the heart of Thu Thiem urban area, belonging to functional area 3. The project is located at the intersection of two major roads: Arc Avenue (renamed Tran street). Bach Dang) and Nguyen Co Thach Street, the section near Thu Thiem Bridge 1. These are also two arterial roads of Thu Thiem with extremely strategic locations.
Thu Thiem Zeit River owns an impressive design invested and developed by the Korean investor GS E&C,
PROJECT OVERVIEW THU THIEM ZEIT RIVER
- Location: Lot 3.11 Thu Thiem New Urban Area, Thu Duc City, Ho Chi Minh City
- Investor: Vietnam GE Enterprise Company Limited (VGSE) is a subsidiary of GS E&C Group Korea
- Developer: GS Engineering & Construction Company (GS E&C)
- Total land area: 9,125.8 m2
- Project functional subdivision:
+ The housing area consists of 2 high-class apartment towers:
T1 tower is 25 floors high
T2 tower 32 floors high
+ Podium area: Including
Shophouse (located on Nguyen Co Thach and Tran Bach Dang streets)
Commercial area, townhouse (located on N7 and D1 streets) combined with garden landscape and some utilities on the ground floor
Area of the heart and walls of each apartment type T1 Tower
1 bedrooms : none
2 bedrooms: 90 m2 - 97 m2
3 bedrooms 125 m2
4 bedrooms 181 m2
Duplex 4 bedrooms: 215 m2
Penthouse: 392 m2
Area of the center wall of each apartment type T2 Tower
1 bedroom 60 m2
2 bedrooms: 88 m2 - 97 m2
3 bedrooms 135 m2
4 bedrooms 201 m2
Duplex 4 bedrooms: 183 m2
Penthouse: 373 m2
- Total number of products: 300 units
1 bedroom: 31 units - accounting for 10.3%
2 bedrooms: 138 units - accounting for 46%
3 bedrooms: 71 units - 23.67%
4 bedrooms: 29 units - accounting for 9.67%
Duplex: 14 units - accounting for 4.67%
Penthouse: 4 units - accounting for 1.33%
Shophouse: 13 apartments account for 4.36%
- Building density:
- Low-rise podium: 56.13%
- Apartment tower: 27%
- Parking area:
Includes 2 basements: with 470 car parking spaces (basement 1: 225 car parking spaces; basement 2: 245 car parking spaces), and 283 motorbike parking spaces
Rate of parking space / Total number of apartments: 1.5
- Ownership period:
Long-term: for people with Vietnamese nationality
50 years: for foreign nationals
- Expected handover time: July 2025
- Handover: basic finishing
- Guarantee bank: BIDV
- Lending bank; BIDV, Vietcombank Ho Chi Minh City (no interest rate support)
- Project legal ===> has a license to sell, can immediately sign a contract purchase and sale
- Management fee: VND 35,000/m2 (DT
clear water)
Phase 1 opens apartment for sale T1 Tower: 2 bedrooms, 3 bedrooms, 4 bedrooms
Phase 2 opening apartment for sale T2 Tower: 2 bedrooms, 3 bedrooms, 4 bedrooms
Booking amount:
300 million VND (For 1 - 3 bedrooms apartment)
500 million VND (For 4 bedrooms apartment)
Average selling price of Rumor for the second phase (July 2023) by wall area: 7000 usd/m2 (excluding VAT)
ABOUT US E&KOREAN INVESTORS
- The investor of the THU THIEM ZEIT RIVER project is Vietnam GE Enterprise Company Limited (VGSE) a subsidiary of GS E&C Group, Korea.
In Korea, GS E&C is ranked 4th in the field of construction civil works according to the ranking of Korean construction companies in 2022.
GS E&C is ranked No. 1 in the luxury apartment sector in Korea
GS E&C has been in Vietnam since 2007, starting with BT projects to build road infrastructure in Ho Chi Minh City such as Pham Van Dong Street, Binh Loi Bridge.
In the North, GS E&C has implemented a number of projects such as: Hanoi - Hai Phong Expressway 6 and 7, Vinh Thinh bridge, Nghi Son oil refinery
GS E & C is also building Metro line No. 1 in Ho Chi Minh City
- In the field of housing construction, Over 10 years ago, GS E&C built and handed over Xi Riverview Palace apartment in Thao Dien District 2
- In 2020, GS E&C started deploying and selling Zeitgeist GS Nha Be Project with a scale of 349 hectares
Soon to be implemented is the GS Metrocity project at Long Binh Depot in District 9 with a scale of 92 hectares (next to Mien Dong New Bus Station).
Thu Thiem Zeist project consists of 3 plots of land with symbols 3.11, 3.7 and 3.3 with a total area of more than 3.3 hectares.
LOCATION OF THU THIEM ZEIT RIVER PROJECT
This project is located right in the heart of Thu Thiem urban area in functional area 3. The project is located at the intersection of two major roads: Arc Boulevard (renamed Tran Bach Dang street) and Nguyen Co Thach street. near Thu Thiem bridge 1. These are also 2 arterial roads of Thu Thiem with extremely strategic location.
CONSULTING PARTNERS FOR THU THIEM ZEIT RIVER PROJECT
PTW: Australian company with hundreds of years of history, designing major projects in the world such as Dubai's Palm Island, City Garden building
Founded in Sydney in 1889, PTW Architects is Australia's leading prestigious design consultancy, known for its unique creativity, architectural innovation and meticulous attention to every little detail of design. .
PTW Architects has designed more than 50 commercial office buildings in Sydney and 150 others across Australia. PTW's works do not stop at Australia but also extend to New Zealand, Dubai, China, many Southeast Asian countries.
OUTSTANDING DESIGNS OF PTW IN THE WORLD
Palm Island – Dubai
The Palm Island artificial island project in Dubai is considered a new invention of the world with the shape of a Palm tree, so it is also known as the Dubai artificial Palm island. This place also becomes the cradle of leading resorts in Dubai such as Atlantis, Jumeirah Zabeel Saray, The Palm, One & Only The Palm...
Palm Island is divided into 3 parts to facilitate the movement of vehicles on the sea and a 4.8km long train tunnel for rapid circulation between the spine and the tree trunk.
Palm Island artificial island in Dubai
Water Cube – China
The Water Cube Aquatics Center is a competition venue built for the Beijing Olympics in 2008 with a capacity of up to 17,000 spectators. With a unique design to increase daylight during the day, it saves more than 55% of the lighting power needed for swimming, also reduces power consumption by 30% and retains 20% of solar energy. weather to warm up.
A special feature is that the Water Cube looks fragile on the outside, but in fact it has the ability to adapt to seismic conditions in Beijing and is considered the world's best seismic resistant building.
Water Cube China Water Sports Center
PTW's DESIGNS IN VIETNAM
Venezia Beach (Binh Chau )
Venezia Beach is a complex project of commerce, service, resort, tourism and entertainment with international brand 5 * to bring visitors the most new and interesting experiences.
The project is designed by PTW with a new, unique and modern architecture, is the leading resort in the Southern region.
City Garden ( Binh thanh district )
With a prime location just 5 minutes by car from the center of Ho Chi Minh City, City Garden is the optimal choice of settlement for people in the city area for easy access to the inner city. The project with 6 blocks from 21 to 30 floors high, provides the regional real estate market with 927 quality apartment products, which are highly appreciated in the market.
PTW Architects is the architectural design unit of the InterContinental Phu Quoc Long Beach Resort project of the investor BIM Land.
Other consulting partners for the Thu Thiem Zeit River project include:
- Land Scuptor: specializes in landscape design, trees, swimming pools, large resorts in Vietnam
- Electrical Design Consultants
- C&S Design Consultants
- Interior Design Consultants
INTERNAL UTILITIES OF THU THIEM AREA ZEIT RIVER
Indoor and outdoor facilities at Ground Floor:
- Swimming pool: using mineral salt electrolysis technology
- Resort sunbathing area
- Sunbathing area (Jacuzzi lake)
- Outdoor children's playground
- Outdoor lawn
- Garden of relaxation
- Fountain,
- Outdoor cafe area, …….
Internal utilities at Level 5 include utilities :
Children's playground, outdoor gym area, BBQ area
Outdoor lounge chair
Elevated walkway
Sunken Lounge (Sunken Lounge)
Outdoor picnic area
Utility floor connecting 2 towers,
Sky Bridge / Sky Bridge (6m x 22m) approved in DP 1/500 is an elevated bridge connecting 3 towers of the project, creating a unique outdoor landscape space and reinforcing character. project icon
TYPICAL FLOOR SURFACE OF T1 & T2 Towers (FLOOR 6 ~ FLOOR 18 )
FLOOR SURFACE OF Each Tower
T1 Tower apartment floor plan:
- 1st floor: community room, lobby, fountain,
- 2nd floor has gym
- 3rd floor - 4th floor - 5th floor: 2 bedroom and 3 bedroom apartment
- 5th floor: utility floor
- 6th floor - 18th floor: 2 bedroom and 3 bedroom apartment
- 19th floor utility floor: sky garden, working and relaxing area on high
- 20th, 22nd floor: Duplex apartments, 4 bedrooms
- Floors 20, 21, 22, 23: 4 bedrooms
- 24th and 25th floor: Penthouse
Floor plan of T2 Tower apartment:
1st floor: reception hall has 2 floors, with play ground, children's playground,
,2nd floor: community room
5th floor: utility floor
3rd floor to 19th floor: 1 bedroom, 2 bedroom, 3 bedroom apartment
The 20th floor (Sky Garden floor) is a utility floor including:
overflow pool sky pool,
Gym,
Emergency shelter
Sky Lounge Counter
Relaxing area
Sunbathing area
White bath area
Jacuzzi
Floors 21, 23, 25, 27, 29: Duplex apartments, 4 bedrooms
21st floor ~ 30th floor: 4 bedroom apartments
31st floor ~ 32nd floor: Penthouse
===>Thus, customers who buy 2 bedrooms and 3 bedrooms can only buy from 3rd to 19th floors,
===> Floors 21 to 30 are 4 bedrooms with Duplex
ZEIT RIVER
LOW-E GLASS APPLICATION IN ZEIT APARTMENT
- Prevent and reduce heat transfer from outside to inside or from inside to outside
- Maximize energy savings with less room heat
- Reduces glare of light thanks to the ability to reduce 50% of light heat when passing through glass
INTELLIGENT PARKING SYSTEM
Applying the most modern and smart technologies to the parking lot
- The system recognizes resident license plates, automatically opens the barrier
- Car finder system and intelligent parking space
- Smart security camera system
SMART APPLICATIONS IN PUBLIC AREA
- Modern camera system is installed in public areas: basement, utility area, corridor, etc.
- Push button system for emergency calls in many public areas, parking lots ... to report to the management board, security team ... in case of an emergency
- Smart Pass system: is an application that can be installed on Smart Phones and activated by residents, when going through Lobby Phone area, the door will automatically open and the elevator will automatically open the door and go to the right floor. apartment is in.
- Lobby Phone system: can ring the bell on the apartment, integrated face recognition
REASONS TO CHOOSE THU THIEM ZEIT RIVER PROJECT:
1. Prestigious investor with 100% foreign capital
In Korea every year, the Department of Construction will announce the ranking of the top 30 construction companies in terms of quality and scale.
In addition, real estate associations also conduct surveys to give a ranking of the top 30 branded real estate companies in the Korean market. The survey is based on criteria such as: love level, brand recognition level, satisfaction level when receiving a house, potential return on investment, ranking of construction contractors.
And the 1st place in the Branded Real Estate ranking belongs to Zeit (자이) of GS E&C Group for two consecutive years 2021 & 2022.
Therefore, in Korea, when you say you are living in a Zeit apartment, it is enough to show your class and status. It's like a brand name item!
2. ZEIT's IMPORTANT LOCATION AND INCREASE PRICE POTENTIAL
Thu Thiem urban area is oriented to become the new financial center of Ho Chi Minh City and Southeast Asia in the future. Thu Thiem is also likened to the Pu Dong (Shanghai) area of Ho Chi Minh City. The potential for urban development and the potential to increase real estate prices in Thu Thiem Urban Area in the future is still very large
PICTURES OF CURRENT SU THIEM URBAN AREA
PICTURE OF THE CURRENT SHANG HAI PU DONG (Luc Gia Chui) AREA
3. ZEIT LEGAL STANDARD
As of mid-May 2023, T1 Tower has been built to the 24th floor, T2 Tower has been constructed to the 25th floor. Customers buy Zeit in the 2nd sale, expected in July 2023 after paying 10%. You can sign a contract of sale right away.
Customers are still allowed to make slow payments until July 2025, if they choose a standard payment schedule
PAYMENT SCHEDULE OPENS FOR PRECAUTION 2 - PROJECT JULY 2023