AQUA CITY Novaland Dong Nai - Smart Ecological Urban Area at the East Gate of Ho Chi Minh City

Date Submitted: 21/01/2021
  • State: Selling now
  • Investor: Novaland
  • Type: Town House
  • Price: 7 Billion VND

Brief Introduction

Aqua City is a smart ecological urban area along Dong Nai river of Novaland group. Aqua City project is also the first eco-urban area in Novaland Group's strategy of developing satellite urban areas.

 

Aqua City Novaland project is located on Huong Lo 2 street, with a scale of more than 1000ha and surrounded by 32km of cool Dong Nai riverbank, so it attracts many interested customers.

 

Introduce 

  • Project name: Aqua City
  • Project location: Long Hung commune, Bien Hoa, Dong Nai.
  • Developer: NovaLand Corporation
  • Project scale:  Multi-utility closed urban area, including a complex of townhouses, luxury villas with about 1000ha, surrounded by more than 32km of riverside road and high density of trees covering the whole area.
  • Type of investment and development:  Shophouse, Townhouse, Single Villa, Duplex Villa.
  • Utilities: Riverside park, commercial center, 5-star marina, school system, indoor and outdoor sports area
  • Legal basis: Separate book for each apartment, long-term ownership
  • Start date: 2019
  • Expected handover time: 2023
  • Handover standard: Basic finishing of the outside according to the pattern, rough inside.

 

 

Reviews of customers who have bought Aqua City Dong Nai

 

 

Cùng đi dạo 1 Vòng Nhà Phố Biệt thự tại Aqua City Đồng Nai

 

 

Where is Aqua City project located? What is the potential?

 

Aqua City project location is at Huong Lo 2, Long Hung, Bien Hoa city. The project is surrounded by 32km of wide Dong Nai riverbank, so the living space is very cool and fresh.

Linking Novaland Bien Hoa project area

Aqua City -> Bien Hoa City Center, Dong Nai: about 10 km, Only about 15 minutes to move

Aqua City -> Long Thanh International Airport: about 15 km, Only about 20 minutes to move.

Aqua City -> Huong Highway 2 --->  Long Thanh – Dau Giay Expressway ---> District 2, Ho Chi Minh City: Only about 20 minutes away

Aqua City -> High-tech Center in District 9 HCMC is only 7 km, only about 10 minutes away

Aqua City ->  Saigon Center 30km,

Aqua City ->  6 km from the last station of Ben Thanh - Suoi Tien Metro line

Aqua City ->  1.5 km from Ben Thanh - Suoi Tien - Bien Hoa Metro line

Aqua City ->  3 to 5 km from Bien Hoa 1, 2, Amata Industrial Parks

 

 

6 reasons why Aqua City Novaland attracts customers

 

1./ QUALITY LIFE ENVIRONMENT.

Aqua City ecological urban area meets what the middle - upper class Saigon is in dire need of. What they care about is the quality of life for the whole family. Therefore, the tendency to choose projects with a quality living environment is the top priority when choosing to buy accommodation.

As an ecological urban area with no smoke, no traffic noise, everything is peaceful and fresh, creating a very good space for relaxation. Thanks to the large scale of over 1000 hectares, of which more than 500 hectares are for trees, water surface and 200 hectares are dedicated to utilities such as schools, hospitals, sports areas...

Along with that, the urban area applies solutions for clean energy and clean water, helping residents have the best quality of life.

 

 

Surrounding the project is 32 km of cool riverbank

 

2./ ENJOY LIFE "ALL IN ONE".

 Living at the project does not lack any high-class facilities that you have thought of. From international schools, international general hospitals, commercial centers, 5-star marinas, Novotel hotels… All are available within the project premises.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3./ EASY TO OWN.

 Only with initial capital from 700 million. Then pay 1% per month, equivalent to 70 million per month for 3-6 years, you already own a riverside townhouse at the project.

 

With a small initial capital, you can also pay monthly installments, but only 3 years later, you have owned a very valuable asset - An asset with high added value - A valuable asset. treatment for future descendants.

4./ YÊN TÂM KHI MUA. 

The investor of the project is Novaland Group. With 28 years of development, more than 40 projects have been built by Novaland. Reputation and strong financial potential are what customers have certified about Novaland Group.

Therefore, customers who buy Aqua City are completely assured of the project's progress, legality, quality, utility and ability to increase prices.

5./ THỜI ĐIỂM MUA TỐT NHẤT. 

Right now is the best time to buy a property that is when the potential infrastructure factor to help increase the price of that property begins construction. The risk of buying a project at this time is greatly reduced.

 

Huong Lo 2 and Vam Cai Bridge are chipped, connecting National Highway 51, passing through AQUA CITY urban area to the HCM - Long Thanh - Dau Giay highway. Vam Cai Su Bridge: The most important item on Huong Lo 2 road was officially built on October 2, 2020. Vam Cai Su bridge project has a total investment of more than 250 billion VND, with a scale of 6 lanes (4 lanes for motor vehicles and 2 lanes for rudimentary vehicles) , Expected to be completed in 18 months, ie April 2022. 1 year before handing over the house at  Aqua City project  (Q2/2023).

 

When the construction of the vam Cai cleft bridge is completed, Perfume Road 2 will connect with the Ho Chi Minh City - Long Thanh - Dau Giay highway, thereby connecting the administrative center of the city. Bien Hoa with Ho Chi Minh City. “Traffic vehicles can travel along this route to go from Dong Nai to Ho Chi Minh City, shortening the distance and travel time from Dong Nai to Ho Chi Minh City down to just 20 to 25 minutes.

 

 

DONG NAI 2 Bridge - KEY INFRASTRUCTURE WORKS
THÀNH DONG NAI 2 Bridge - CONNECTING DISTRICT 9 ( VINHOMES GRAND PARK ) WITH BIEN HOA AND LONG THANH AIRPORT
Dong Nai 2 Bridge is a key traffic project connecting Ring Road 3, section of Vinhomes Grand Park in District 9 with Huong Highway 2, Bien Hoa City. The project not only reduces traffic on the National Highway 1A, but also helps the East area of ​​Ho Chi Minh City to move conveniently to the International Airport Long Thanh in the future.

 

 

LONG THANH SUPER AIRPORT CONSTRUCTION PROJECT.

Officially started on January 5, 2021, Long Thanh airport will come into operation from December 2025


According to the plan, when completed, Long Thanh will be the largest airport in the country with a capacity of up to 100 million passengers/year and 5 million tons of cargo/year.

 

 

Long Thanh International Airport: unknown things, Vnews

 

 

Nearly VND 10,000 billion to expand Ho Chi Minh City - Long Thanh expressway

The Ho Chi Minh City - Long Thanh - Dau Giay Expressway passing through Ho Chi Minh City and Dong Nai is proposed to double over a length of 24 km, with an investment of nearly 10,000 billion VND.

 

This plan has just been submitted to the Ministry of Transport by the Cuu Long Transport Infrastructure Management and Development and Investment Corporation (Cuu Long Corporation) to accelerate investment in expanding the expressway, contributing to solving traffic congestion. congestion and meet the increasing travel demand.

 

The proposed extension is 24 km in length out of a total of 55 km of the entire route. The starting point is from Ba Dat Bridge (District 2, Ho Chi Minh City) to the intersection of Bien Hoa - Vung Tau Expressway (Long Thanh District, Dong Nai). This section widens the road surface to double the current one, from 4 to 8 lanes. The rest from Long Thanh to Dau Giay, 31 km long, remains the same.

 

 

CAT DRIVE BRIDGE
 

Cat Lai Bridge is considered the "lifeline" connecting Dong Nai with Ho Chi Minh City, which people have been waiting for many years. Expected to start construction in 2021 or 2022, the bridge has a main part of 650 m long, 37.7 m wide, including 6 lanes for motor vehicles and 3 lanes for rudimentary vehicles, with a pedestrian margin of 1.5 m on each side; structure by cable-stayed two tower shafts.


When Cat Lai Bridge is completed, it will contribute to reducing the traffic load from District 2 of Ho Chi Minh City to Nhon Trach Dong Nai via Long Thanh - Dau Giay Expressway, shortening the traffic time from District 2 to Nhon Trach Dong Nai , promoting the economic development of Nhon Trach Dong Nai in the coming years

 

 

Close-up of the location where Cat Lai Bridge will be built

 

 

 

6./ The selling price is still very good because the urban area is just beginning to form.

In the first stage, the selling price will always be much better than when the project is completed and residents move in.

 

The preferential and payment policy is also very good. To attract customers to buy projects, Novaland has many preferential policies with spread payments. In the next 1-2 years, when everything is almost there, Novaland will certainly no longer offer good incentives like today.

 

Neighboring projects
Go Top
0909 708 227